Sign In | Join Free | My ccnmag.com
China Zhangjiagang HuaDong Boiler Co., Ltd. logo
Zhangjiagang HuaDong Boiler Co., Ltd.
Zhangjiagang HuaDong Boiler Co., Ltd.
Verified Supplier

9 Years

Home > Boiler Economizer >

SA210A1 Tubes Boiler Economizer Banks With SA240 - 309S Shields For Waste Incinerator

Zhangjiagang HuaDong Boiler Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

SA210A1 Tubes Boiler Economizer Banks With SA240 - 309S Shields For Waste Incinerator

Brand Name : HDB

Model Number : Boiler Economizer

Certification : ASME, EN, ISO9001, SGS

Place of Origin : China

MOQ : 1 set

Price : Negotiable

Payment Terms : L/C, T/T, Western Union

Supply Ability : 500 tons per month

Delivery Time : 60~150 days

Packaging Details : Seaworthy packing

Porduct Name : Boiler Economizer Banks

Application : Coal-fired Boilers and Waster Incinerator

Material : SA210A1 and SA240-309S

Keyword : Boiler Economizer

Production Technique : Hot Bending, Extrusion

Loading Port : Shanghai, China

Contact Now

SA210A1 Tubes Made Boiler Economizer Banks With SA240-309S Shields For Waste Incinerator

Product Introdution

Boiler economizer is kind of heat exchanger to heat the feed water using the flue gas heat. The flue gas coming from the tube outside is up and down cross-flow scrubbing the tube bundle, passing the heat to the tube wall. The water is flowing from bottom to top, and absorts the heat from the tube wall, and its temperature is getting high. This way not only can countercurrent heat transfer to save metal consumption, but also is good for water/steam to flow and exhaust as well as decreasing corrusion. One more, this way works well for dust cleaning.

Parameters of Boiler Economizer

Description Boiler economizer
Material SA210A1 and SA240-309S
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames

SA210A1 Tubes Boiler Economizer Banks With SA240 - 309S Shields For Waste Incinerator

Working Process of Boiler Economizer

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).

Company Profile

The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.

SA210A1 Tubes Boiler Economizer Banks With SA240 - 309S Shields For Waste Incinerator


Product Tags:

SA210A1 Tubes Boiler Economizer

      

Tubes Boiler Economizer For Waste Incinerator

      

Hot Bending Tubes Boiler Economizer

      
China SA210A1 Tubes Boiler Economizer Banks With SA240 - 309S Shields For Waste Incinerator wholesale

SA210A1 Tubes Boiler Economizer Banks With SA240 - 309S Shields For Waste Incinerator Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhangjiagang HuaDong Boiler Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)